Remediation of Lake Boyuk Shor

With the first European Games in June 2015 as an immediate cause, the first phase remediation of the largest lake, Boyuk Shor. In an engineering and design project, the selected approach was developed into technical-methodological solutions of the various project components for the remediation. This envisaged the engineering surveys and investigations, landscape design, technical basic and detailed designs including permits and EIA and technical specifications for contracting.

Supervise construction and execution works

In parallel to the engineering and design project, a separate contract was started, to supervise the construction and execution works of the project parts of which the designs were finished. The project resulted in the isolation by dams and cleanup of the lake bottom of approximately one third of the lake, environmental safe storage of the sediments, construction of a boulevard and a park. This project started in June 2014. On May 22nd 2015 the project was presented to the President of the Republic.

Services provided;

  • surveys and investigation
  • feasibility study
  • master planning and landscape design
  • basic design
  • detailed design
  • permitting and EIA
  • project management and supervision